In Biberach, Ayka Group delivered a large scale fiber project for Deutsche Giganetz with around 705 connections. Work included blowing fiber and mounting connections, without underground cabling.
In total around 124 km of cable was handled, including 59 km house cable and 65 km main cable. The team also built and dismantled network rings including NVTs, POPs and joints.
