Built and managed, in NL and DE

A selection of completed projects in the Netherlands and Germany. Not our full history, but a representative view of what we build and operate for network operators, municipalities and major organisations.

FttH Krefeld, DE

Deutsche Telekom

Krefeld, FttH rollout

For Deutsche Telekom 377 homes mounted and blown, with around 75 km cable of which 12 km main cable.

  • 377 homes connected
  • 79 extra homes
  • 75 km total cable
Read the case
FttH Schwalbach, DE

Deutsche Giganetz

Schwalbach, fiber rollout

For Deutsche Giganetz around 106 homes connected with 34 km cable and 2,500+ splices.

  • 106 homes
  • 34 km cable
  • 2,500+ splices
Read the case
FttH Geisenheim, DE

Deutsche Giganetz

Geisenheim, fiber rollout

For Deutsche Giganetz around 101 homes connected with 32 km cable and 2,500+ splices.

  • 101 homes
  • 32 km cable
  • 2,500+ splices
Read the case
Hardenberg HBD-1, security network
Utility Hardenberg, NL

Enexis Netbeheer BV

Hardenberg HBD-1, security network

For Enexis Netbeheer fiber links between security systems on electrical substations and local distribution.

  • Enexis Netbeheer
  • Security systems
  • Local distribution
Read the case
FttH Oestrich-Winkel, DE

Deutsche Giganetz

Oestrich-Winkel, phase 2

Follow up to phase 1 for Deutsche Giganetz, around 174 homes connected with 37 km cable and over 3,500 splices.

  • 174 homes
  • 37 km cable
  • 3,500+ splices
Read the case
FttH Bonn, DE

Deutsche Telekom

Bonn, FttH connections

For Deutsche Telekom around 180 homes were connected, with fiber installation across roughly 40 kilometres of cable.

  • 180 homes
  • 40 km total cable
  • 34 km house cable
Read the case
FttH Oestrich-Winkel, DE

Deutsche Giganetz

Oestrich-Winkel P, fiber expansion

In direct partnership for Deutsche Giganetz around 95 homes connected, 19 km cable and 1,900+ splices.

  • 95 homes
  • 19 km cable
  • 1,900+ splices
Read the case
Kirchhausen, FttH expansion
FttH Kirchhausen, DE

Laczpol Telekommunication Deutschland GmbH

Kirchhausen, FttH expansion

For Laczpol Telekommunication Deutschland around 180 homes connected, 74 km cable and 4,000+ splices.

  • 180 homes
  • 74 km cable
  • 4,000+ splices
Read the case
Offenau, FttH expansion
FttH Offenau, DE

Laczpol Telekommunication Deutschland GmbH

Offenau, FttH expansion

In direct partnership with our tiefbau partner for Laczpol around 220 homes connected, 68 km cable and 7,000+ splices.

  • 220 homes
  • 68 km cable
  • 7,000+ splices
Read the case
FttH Erlenbach, DE

Laczpol Telekommunication Deutschland GmbH

Erlenbach, large rollout

For Laczpol with our tiefbau partner around 420 homes connected, 198 km cable and 9,000+ splices.

  • 420 homes
  • 198 km cable
  • 9,000+ splices
Read the case
Massenbachhausen, fiber network repair
Recovery Massenbachhausen, DE

Laczpol Telekommunication Deutschland GmbH

Massenbachhausen, fiber network repair

For Laczpol a recovery project on main cable and distribution, with 3,000+ new patches and 400 splices.

  • 3,000+ patches
  • 400 splices redone
  • Main cable restored
Read the case
Kommern, FttH rollout
FttH Kommern, DE

Deutsche Telekom

Kommern, FttH rollout

For Deutsche Telekom around 498 homes fitted with fiber, with roughly 109 km cable and 33 km main cable including backbone.

  • 498 homes
  • 109 km total cable
  • 33 km main cable
Read the case
FttH Kelkheim, DE

Deutsche Giganetz

Kelkheim, fiber rollout

For Deutsche Giganetz around 333 homes built, 115 km cable and 47 km main cable.

  • 333 homes
  • 115 km cable
  • 47 km main cable
Read the case
FttH Rheinbach, DE

Deutsche Telekom

Rheinbach, phase 2

For Deutsche Telekom phase 2 with around 420 homes delivered, 112 km cable and 18 km main cable.

  • 420 homes
  • 300 new build
  • 112 km cable
Read the case
Biberach, large scale rollout
FttH Biberach, DE

Deutsche Giganetz

Biberach, large scale rollout

For Deutsche Giganetz around 705 connections, 124 km cable and build out of rings, NVTs and POPs.

  • 705 connections
  • 124 km cable
  • 65 km main cable
Read the case
Bornheim, phase 3
FttH Bornheim, DE

Deutsche Telekom

Bornheim, phase 3

For Deutsche Telekom around 473 housing units blown and connected, with roughly 102 km cable and 22 km main cable.

  • 473 housing units
  • 102 km total cable
  • 22 km main cable
Read the case
Dorsten, three clusters
FttH Dorsten, DE

Deutsche Telekom

Dorsten, three clusters

In direct partnership for Deutsche Telekom three clusters built, around 130 homes and 25 km cable.

  • 130 homes
  • 3 clusters
  • 25 km cable
Read the case
FttH Jesteburg, DE

EWE Netz

Jesteburg, fiber emergency deployment

For EWE Netz during covid period, 36 homes connected within one week.

  • 36 homes
  • 1 week lead time
  • Covid response
Read the case
Eintracht Frankfurt, LED stadium screen
Installation Frankfurt, DE

Eintracht Frankfurt

Eintracht Frankfurt, LED stadium screen

Full build and install of a circular LED screen above the pitch, at the time the largest of its kind in Europe.

  • Circular LED
  • Largest in Europe
  • Above pitch
Read the case
Book a call

Work with a partner that takes your network as seriously as you do

A short intro call quickly shows what we can do for you.