FttH Bornheim, DE November 2023

Bornheim, phase 3

For Deutsche Telekom around 473 housing units blown and connected, with roughly 102 km cable and 22 km main cable.

Bornheim, phase 3

The Bornheim project was the third phase of Deutsche Telekom’s ongoing rollout in the region. Ayka Group handled mounting and blowing fiber in both main and house connections.

In total around 102 km of cable was installed, including 22 km of main cable, for roughly 473 housing units.